java date bigger than

ww‮al.w‬utturi.com
java date bigger than

In Java, you can compare two java.util.Date objects using the compareTo method or the before and after methods.

Here is an example of how to compare two Date objects to determine if one is greater than the other:

import java.util.Date;

public class Main {
  public static void main(String[] args) {
    Date date1 = new Date(2020, 1, 15);  // February 15, 2020
    Date date2 = new Date(2020, 3, 15);  // April 15, 2020

    // Compare the dates using the compareTo method
    int result = date1.compareTo(date2);
    if (result > 0) {
      System.out.println("Date1 is greater than Date2");
    } else if (result < 0) {
      System.out.println("Date1 is less than Date2");
    } else {
      System.out.println("Date1 is equal to Date2");
    }

    // Compare the dates using the before and after methods
    if (date1.after(date2)) {
      System.out.println("Date1 is greater than Date2");
    } else if (date1.before(date2)) {
      System.out.println("Date1 is less than Date2");
    } else {
      System.out.println("Date1 is equal to Date2");
    }
  }
}

In this example, we create two Date objects representing different dates, and then compare them using the compareTo method .

Created Time:2017-11-03 00:14:53  Author:lautturi